Klein Frankrijkstraat 1

B-9600 Renaix

 

Tel: +32 (0)55/21.71.56

Fax: +32 (0)55/21.71.56

Fax: +32 (0)55/21.99.02

 

info@interdoorline.be

Door panels | 100% own production

fr - nl - en

Manual- Installation priorities for privates doors

PRIORITIES OF INSTALLATION OF A GATE

 

The positioning of the distance tubes on the 2nd wheel
The door leaf should come halfway up the vertical PVC rubber
IDL always works with standard rails, vertical rail (+ PVC ) must be cut off above the daylight height 7cm
The positioning of the spring
The positioning of the spring